Central Lake- Thurston Park For Everyone Campaign

Because of your incredible generosity, we’ve reached our original fundraising goal for the Thurston Park improvements for Phase 2, but we are not done yet!

Thank you to everyone who has donated, shared our campaign, and cheered us on. Your support has demonstrated just how much this community believes in creating welcoming, accessible public spaces for everyone.

Reaching our goal means we are on track to complete the 2nd phase of the project. This includes improved accessibility throughout the park, upgrading one restroom (including an adult changing station), accessible picnic tables, drinking fountain and enhancements to the community pavilion. 

There is still time to be part of Phase 3 of this project.  

Help Us Build What’s Next

These additional funds will help prepare for:

  • An accessible pathway connecting the park to the beach and waterfront.
  • universally accessible swing set, allowing children of all abilities to participate.
  • Upgrades to the second bathroom.  

Every additional dollar raised will strengthen our community’s investment in Thurston Park and help position us to leverage future grant funding to bring these improvements to life.

If you’ve already donated, thank you for believing in this vision. If you haven’t yet had the opportunity, there’s still time to be part of creating a park where everyone can connect with nature, gather with friends and family, and enjoy the beauty of Central Lake.

Together, we’re not just improving a park—we’re creating a place where everyone belongs.

Thank you for being part of this journey.

Investing in Community, Accessibility & Water Stewardship

Paddle Antrim, in partnership with the Village of Central Lake and Central Lake Lions, is launching an exciting initiative to revitalize the Central Lake waterfront—enhancing access, promoting stewardship, and deepening community connections to the Chain of Lakes Water Trail.

Phase 1: Completed – Includes new universally accessible kayak launch, kayak storage rack, pathways and parking area on the east side of Intermediate River.
Phase 2: Funded (completion estimated Summer 2027) – Includes connected pathways in the park to downtown and the eastside improvements and to pavilion and restroom. Updated accessible restroom with adult changing station. Accessible picnic tables, benches and drinking fountain.
Phase 3: Fundraising in progress – Completion of 2nd restroom, pathway to beach, accessible swing.  

DONATE TODAY!!!


Why This Matters

The Chain of Lakes Water Trail is a vital natural asset connecting people, communities, and ecosystems. After years of planning and community input, this project will reflect what matters most:

  • Stewardship: Shoreline protection, boat wash stations, and environmental education.
  • Accessibility: ADA-accessible restrooms, launches, and pathways.
  • Safety & Navigation: New signage, no-wake zones, and user separation.
  • Community Connections: Secure kayak storage, shuttle service, and easier access to food and drink.

“This is more than an infrastructure project. It’s an investment in the health of our waters and the vibrancy of our community.”


What’s Planned

We’re creating a functional, beautiful, and inclusive waterfront.

West Side Enhancements

  • Accessible restroom facility
  • Accessible Parking
  • Pavilion and improved walkways
  • Accessible swing
  • Accessible amenities: drinking fountain, picnic tables, and benches

East Side Enhancements

  • Paddlecraft Storage and signage
  • Accessible kayak launch and connected paths
  • Accessible Parking and drop off zone

View the concept rendering here 

View the full case statement here


Project Timeline & Funding

We’ve built strong momentum and secured major support including a DNR Trust Fund Grant. Now we need our community to help close the gap.

Timeline

| 2025 | Fundraising Continues |
| Q1 2026 | Final Design & Bidding Phase 1 |
| Summer–Fall 2026 | Construction & Completion Phase 1|
| 2026 | Fundraising Continues |
| Q4 2026 | Final Design & Bidding Phase 2 (& 3 if funded) |
| Spring-Summer 2027 | Construction & Completion Phase 2 (& 3 if funded)|


How You Can Help

Central Lake is a gem in the Chain of Lakes—and this project will make it a safe, welcoming, and connected waterfront for all.

Make a Gift Today
Donate Now

Spread the Word
Share this campaign with friends, neighbors, and community groups.

Connect With Us
Interested in sharing your thoughts or getting more involved? Contact us

Together, we can ensure Central Lake remains a place where water, community, and nature connect.